Sewerage Network Expansion — Al-Zahraa District, Aleppo

Ongoing 2024 Aleppo

Laying 24 kilometres of primary and secondary sewer lines with an intermediate pumping station, serving nearly 30,000 residents in the north-western districts of Aleppo.

The project replaces the deteriorated legacy network and connects newly developed districts to the main collector through high-density polyethylene lines with diameters ranging from 300 to 800 mm.

Scope includes an intermediate pumping station with a capacity of 120 litres per second, complete with control panels and a standby generator, alongside 410 inspection chambers and road-surface reinstatement above the trench routes.

The project is under execution within a 22-month programme, with more than 60% of the planned line lengths completed to date.

Laying the 800 mm main line
Excavation works within residential districts
Electromechanical equipment of the pumping station